Pennsylvania Steel Co.

Allgemeines

NamePennsylvania Steel Co.
OrtssitzPhiladelphia (Penns.)
StraßeSouth Fourth street 216
Art des UnternehmensStahlwerk
Anmerkungen1876: 216 South Fourth street, Philadelphia. 1896: Rooms 312-19 Girard Building, Broad and Chestnut Streets. Two Siemens open-hearth furnaces (Siemens-Martin-Stahlwerk). 1896 mit Hochofenwerken in Steelton und Lochiel Furnace in Harrisburg (siehe beide).
Quellenangaben[Ironworks of the United States (1876) 128] [Philadelphia and popular Philadelphians (1891) 154]




Produkte

Produkt ab Bem. bis Bem. Kommentar
Betrieb von Eisenhüttenwerken 1876 [Ironworks of the U.S. (1876)] 1876 [Ironworks of the U.S. (1876)] Siehe betriebene Werke!
Siemens-Martin-Stahl 1876 [Ironworks of U.S. (1876)] 1876 [Ironworks of U.S. (1876)]  




Firmen-Änderungen, Zusammenschüsse, Teilungen, Beteiligungen


Zeit = 1: Zeitpunkt unbekannt

Zeit Bezug Abfolge andere Firma Kommentar
1 Nebenwerk danach Lochiel Furnace gepachtet
1876 Nebenwerk danach Pennsylvania Steel Co., Werk Steelton Stand: 1876
1876 Nebenwerk danach Baldwin Furnace Stand: 1876




Allgemeines

ZEIT1891
THEMABeschreibung
TEXTThe Pennsylvania Steel Company, Steelton, Pa., and Sparrow's Point, Md., was the first company organized in this country for the manufacture of steel by the pneumatic process. On May 5, 1867, the first blow was made in the works at Steelton, Pa. The ingots were sent to Johnstown, rolled in the iron rail mills of the Cambria Iron Company, and the rails delivered to the Pennsylvania Railroad Company. Before this date, one or two iron works had experimented with the new process and some metal had been produced, but these were the first steel rails ever manufactured in this country, on an order in regular course of business. A rail mill was finished in May, 1868, and rolled rails directly from 7-inch ingots. In 1869 a 15-ton hammer was built which at the time was the largest in the country. All ingots were then made twelve inches square and hammered into blooms for the rail mill. Since that time the works have progressed in equipment, capacity and specialization by the improvement of the old plant and the building of the following new departments:
1872: Frog Shop.
1873: No. 1 Blast Furnace, 16x65 feet.
1875: No. 2 Blast Furnace, 20x80 feet, and an Open Hearth Department of two 5-ton furnaces, which have since been demolished.
1876: No. 1 Blooming Mill, three high.
1881: No. 2 Bessemer, three 7 ton converters.
1882: New Frog, Switch and Signal Department. Merchant Mill with 20" and 13" trains. During this year a school-house
costing about 170,000 was built by the Company and presented to the borough of Steelton.
1883: The No. 1 Bessemer was run for six months with basic linings, this being the first regular basic Bessemer practice ever carried on in this country.
1S84: No. 1 Open Hearth, two 25-ton furnaces. Nos. 3 & No. 4 Blast Furnaces, 18x70 feet.
1885: Universal Mill.
1886: No. 2 Blooming Mill, two high.
1888: Billet Mill. No. 2 Open Hearth, one 5-ton rotary furnace.
1890: Steel Foundry. Bridge and Construction Department. No. 3 Open Hearth, two 15-ton basic tilting furnaces.
In addition to the above, a forge department of three hammers, a foundry, machine shop, boiler shop and other auxiliary repair shops have been gradually supplied. The works now have a capacity of about 30,000 tons of steel ingots per month, which is rolled into rails (heavy, light and street), Open Hearth and Bessemer slabs and ingots for plates of all kinds, miscellaneous merchant steel, special steel billets and forgings. The Bridge and General Construction Department is ready to enter actively into business, while the production of the Frog, Switch and Signal Department stands second to none in the country In 1S83 the Company, in partnership with the Bethlehem Iron Company, purchased extensive ore lands in southeastern Cuba. About 30.000 tons of ore per mouth are imported from this source. To bring the manufacture into more direct connection with the raw material, the Company is building a new and extensive works
on tide water, at Sparrow's Point, near Baltimore, Md. Four blast furnaces, 85x22 feet, are already built, two of them having been put in operation in 1889. A ship yard is already engaged in building vessels, and a Bessemer plant and rail mill will start in the summer of 1891. The works at Steeltou cover an area of 180 acres and employ about 4.200 men, the monthly pay roll amounting to $175.000. The lands of the Company at Sparrow's Point cover about 1,000 acres. The number of workmen at present is 1.400, and the monthly pay roll 165.000. Philadelphia office, 208 South Fourth street. Officers: Luther S. Bent, president; Eben F. Barker, vice-president; Edmund N. Smith, secretary and treasurer; F. W. Wood, general manager; E. C. Felton, superintendent.
QUELLE[Philadelphia and popular Philadelphians (1891) 154]