|
|
Riverside Iron Works
| Name | Riverside Iron Works |
| Ortssitz | Wheeling (West Virginia) |
| Art des Unternehmens | Walzwerk |
| Anmerkungen | Built in 1854, and since enlarged; 37 single puddling furnaces (13 of these being in the Washington Mill, leased and operated by the Works), 6 heating furnaces, 126 nail machines, and 3 trains of rolls. 1889: mit 75 ft. hohem Hochofen |
| Quellenangaben | [Ironworks of the United States (1876) 97+115] [Journal of the Iron and Steel Institute 1 (1889) 309] |
| Zeit |
Ereignis |
| 1854 |
Bau des Walzwerks |
| 1875 |
Umbau des Werks nach einem Brand |
| Produkt |
ab |
Bem. |
bis |
Bem. |
Kommentar |
| Betrieb von Eisenhüttenwerken |
1876 |
[Ironworks of the U.S. (1876)] |
1876 |
[Ironworks of the U.S. (1876)] |
Siehe betriebene Werke! |
| Walzprofile |
1876 |
[Ironworks of U.S. (1876)] |
1876 |
[Ironworks of U.S. (1876)] |
|
Zeit = 1: Zeitpunkt unbekannt
| Zeit |
Bezug |
Abfolge |
andere Firma |
Kommentar |
| 1876 |
Nebenwerk |
danach |
Riverside Furnace |
Stand: 1876 |
| ZEIT | 1876 |
| THEMA | Beschreibung |
| TEXT | Built in 1854, and since enlarged; 37 single puddling furnaces (13 of these being in the Washington Mill, leased and operated by the Works), 6 heating furnaces, 126 nail machines, and 3 trains of rolls (one 8, one 12, and one 21-inch); product, bar iron, light T rails, railroad spikes, and nails; annual capacity, 20.000 net tons. Part of the mill was burnt and rebuilt in 1875. J. N. Vance, President; John D. Culbertson, Treasurer, and N. Wilkinson, Secretary. Siehe auch "Riverside Furnace". |
| QUELLE | [Ironworks of the United States (1876)] |
|