|
|
Glen Iron Works
| Name | Glen Iron Works |
| Ortssitz | Allentown (Penns.) |
| Art des Unternehmens | Walzwerk |
| Anmerkungen | First put in operation in 1870; 6 double and 2 single puddling furnaces, 3 heating furnaces, and 3 trams of rolls (one 8J and two 15-inch); product, bar iron and small T rails; annual capacity, 7.500 net tons; average make, 5.400 tons, Joseph Downing, Superintendent. Not in operation in 1875. |
| Quellenangaben | [Ironworks of the United States (1876) 76+113] |
| Zeit |
Ereignis |
| 1870 |
Erstmals in Betrieb genommen. |
| Produkt |
ab |
Bem. |
bis |
Bem. |
Kommentar |
| Walzprofile |
1876 |
[Ironworks of U.S. (1876)] |
1876 |
[Ironworks of U.S. (1876)] |
|
|